Office of Security & Integrity - Burlington, Vermont

Property Description

The firm's most recent project is the 27,000 square foot Office of Security and Integrity in Burlington Vermont. This project features innovative security features in keeping with the location's natural environment. The 7.8 acre site featurese a nature preserve at its back. Blasting was required to prepare the site for building. The large boulders created from the blasting were used as a security barrier protecting the building. Birchwood stepped forward on this project as a team player incorporating blast windows into the building. The building's design also qualifies for Silver LEED pre-certification.

Property Facts

  • 27,000 Square Feet
  • 7.8 Acre Site backs up to Nature Preserve
  • Silver LEED Pre-Certified
  • Completed July 2009
  • 8 Month Completion Time
  • Built with Blast Windows
  • Innovative Security Feature
  • Indigenous Boulders Used as Passive Restrains

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Citizenship & Naturalization District Office - Detroit, Michigan

Property Description

In February of 2009 the firm completed the 60,000 square foot Citizenship & Naturalization District Office in Detroit Michigan. The 2-story building includese a central atrium and was designed to house distinct and seperate functions including the District Director & Staff suite and the Field Office which also hosts the Application Support Center. Although not required but keeping with Birchwood's innovative design capabilities, a secure and enclosed shipping and receiving area was created. This enclosed structure links the parking garage with the building and features a scissor list. This building's design qualified for Gold LEED pre-certification.

Property Facts

  • 2-story 60,000 Square Foot Building with Central Atrium
  • 26,500 Sq Ft of Expansion
  • 3.1 Acre Site
  • Gold LEED Pre-Certified
  • Prominent Corner Location
  • Separate Parking Areas (Visitors, Employees and Secure Delivery)
  • Houses Distinct & Separate Functions - District Office & Staff Field Office with Application Support Center
  • Completed February 2009

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

US Border Patrol Station - Riviera Beach, Palm Beach County, Florida

Property Description

In 2004 the Firm completed the US Border Patrol Station in Riviera Beach Florida. This 40,000 square foot building was completed in seven months. Built an additional five feet above the flood plan code (at additional expense to the developer) the development proved to be a safe haven in the aftermath of three hurricanes. The strength and durability of the building was proven soon after completion as it weathered hurricanes Francis, Jean and Wilma. While other nearby facilities were without power and flooded including the Coast Guard Station, this building was fully operational within 48 hours after the storm. Birchwood's principal had the equipment and expertise to repair the minimal damage to the property at a time when these services were unavailable through traditional means. With nearly all services and commerce stopped in Palm Beach County for the weeks after each storm, the Border Patrol station was never out of service. In addition to its strength and safety the building design is a compliment to its South Florida location.

Property Facts

  • 39,405 Square Feet
  • 3.5 Acre Site
  • Built 5 Feet above Building Code Enabled Building to Weather 3 Hurricanse with no Loss of Services
  • Provided Safe Haven to Coast Guard, Agents & Families
  • Completed June 2004
  • 7 Month Completion

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Jacksonville Border Patrol Station - Jacksonville, Florida


Property Description

One month prio to breaking ground on the Riviera Beach Border Patrol Station ground was broken on the Jacksonville Border Patrol Station. This 18,124 square foot, single story building sits on a 3.5 acre site and was completed in 6 1/2 months. It has similiar design features as the Riviera Beach Station including perimeter fencing and secured parking.

Property Facts

  • 18,124 Square Feet
  • 4.5 Acre Site with room for 10,000 sq. ft. expansion
  • Secured, covered and enclosed government and employee parking area
  • Exterior perimeter fence with rolling gates and card reader system
  • Perimeter Fencing
  • Completed April 2004
  • 6 1/2 Month Completion

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Drug Enforcement Agency Office - Tampa, Florida


Property Description

The firm's first project in 1995 was the 30,626 square foot DEA office in Tampa FL. Birchwood purchased Kennedy Square, a 90,000 square foot building and completed a renovation of the common areas and mechanical systems. The build out for the DEA was completed in just 60 days. The DEA continues to occupy the building.

Property Facts

  • Westshore Business District
  • 90,000 Square Feet
  • Revonvated an existing 90,000 SF Building
  • Fully renovated common and mechanical systems
  • DEA Office build out completed in 60 days

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Immigration & Naturalization Office - Tampa, Florida


Property Description

In 1998 the Tampa Immigration Office was completed. The entire building is 52,000 square feet on six acres with 26,000 square feet of office space and secured, enclosed parking with 65 spaces. The project, completed prior to the LEED certification process, includes several energy efficient innovations. Considered cutting-edge at the time, these features include a Geo-thermal HVAC system and energy efficient lights. Environmentally conscious, the developer was able to find a new use for a former landfill. Pilings driven into the site's bedrock raise the building above the landfill while an innovative system redirects methane gas. The developer did much of the site work themselves resulting in considerable savings. All of this work was done in some of the most challenging development conditions the area has ever experienced. Flooding and record rains were prevalent during nearly the entire development process. Despite the conditions of the record rain months of "El Nino" the project was completed in just seven months.

Property Facts

  • Westshore Business District
  • 6 Acre Site - New use for former landfill
  • 52,500 Square Feet. 26,000 SF Office space. 65 space enclosed, secure parking
  • Holding cells & Sallyport
  • Energy efficiencies with Geo thermal HVAC
  • Completed July 1998
  • 7 Months completion time in spite of record rainfall during El Nino storms